![]() |
| Order On Line or 718.436.0303 |
|


| 4. ASSEMBLY OF LAST CORNER (This step is for a 4-sided sukkah only.) On a 4-sided sukkah, one corner must be left for last, This last corner will use the 2 short corner sections to join the last two panels together. These 2 short corner sections are to be slid in place, (instead of hooked) starting at the top of the last corner and sliding down. NOTE: You may need a step ladder to see that you are sliding the corner sections in properly. NOTE: If you have difficulty sliding this last corner into position, you can use any metal lubricant spray such as "WD-40". |
![]() |
| 5. TOP OF SUKKAH WOOD BEAM ASSEMBLY Place the pre-notched lumber beams on the top of the Sukkahm as shown in the illustration.
|
|
| FOR SUKKAHS LARGER THAN STANDARD SIZE Special Top Brace Clamp Brackets have been provided to give the walls greater rigidity and stability. |
|
| FOR SUKKAHS WITH ONLY 3 WALLS Attach the (2) Wall Support Brackets (that have been provided) to wall with screws. This can be a permanent installation. |
|
| About Leiter's | Our Sukkahs | Bamboo Mats & Poles | Assembly Instructions | View Cart | Checkout |